NEW LOGISTICS POLE IN NINGBO

On November 22nd 2014 the new facility that houses the headquarters of ITR Far East and the Asian subsidiary of Track One has been inaugurated in Ningbo (China).

The new premises cover an area of 4500 sqm and have inside different areas dedicated to the assembly of complete Track One frames as well as to the storage of undercarriage, GET and repair parts.
In addition to the offices there is a laboratory dedicated to the quality control on products in transit.
The significant expansion and relocation of the two companies into a single operational headquarter will help to increase the logistic support for all business lines and strengthen the supervision of local suppliers .

Êtes-vous passionné par les engins tp?

Nous partagerons avec vous notre savoir-faire, nos compétences et des faits intéressants sur les engines de terrassement. Rejoignez la communauté du groupe ITR!

Votre privacy est sécurisée. Nous ne spammons pas.

* Consentement au traitement des données ex art. 7 du Règ. UE n° 679/2016